Friday, March 19, 2010
Waterproofing
Well, we got the plastic up around the basement. I am learning so much with this house!! The plastic was in a ten foot high roll and about 70 feet long. And it wasn't like garbage bag plastic, but more like floor mat plastic! It was so heavy and hard to work with! We had to recruit some help for the first time just to get it up and screwed down! Here are some pics of it going up. There is also one of the stairs that are going in.

Monday, March 15, 2010
Slow but steady
Well, things have been a little slow this week. We are waiting for the plastic from PolySteel to put around the basement to keep water out. It should be in today. Dan tried to use this other sealer stuff that you paint on, but I guess it was a disaster and made quite a mess! It took poor Krystal 3 days to completely get it off her hands! We have all been sick, so it's kind of a welcome break, but Dan worries constantly about falling behind schedule. Funny, I thought I would be the one worried about the time since I'm so impatient to move in! I can feel the walls of the mobile home closing in around me. . . . . . . .AAAAAHHHHHH! ; ) But once we get the plastic on we can start backfilling around the basement and get right back on track. I'll be back with more pics when we do!
Thursday, March 11, 2010
The walls are done!
Hooray, the walls are done! We poured the concrete in them on Monday and WHEW! What a job that was! We had this 2" hose that pumped the concrete to where we needed it. And that thing was SO HEAVY when it was full of concrete! Thanks to Brad (the pump guy) for his help or I would have been in trouble! I'm including pics of the walls all the way up, a side view so you can see it from ground level, and Dan with the hose. There is also a shot of the concrete inside the wall. Now we have to wrap the outside of the blocks in plastic to waterproof it before we can start backfilling. Moving right along. . . . . . .

Sunday, March 7, 2010
Basement walls
Well, the basement walls are almost finished! My camera battery ran out, so I'll have to post the finished ones later, but here are some pics of the walls going up! It may not look like much, but it was a ton of work! The first layer of blocks had to be measured all the way around to make sure it was straight and level, then they had to be glued to the floor. Then, if you look closely, you can see that we had to extend the rebar to about 12-13 feet high. The rest of the blocks had to be lifted up over the top and slid down onto the bars! Thanks to Bill and Winnie for the use of their scaffolding--made it SO much easier for us!


Thursday, March 4, 2010
Monday, March 1, 2010
Update
Wow! I hadn't realized how far behind I am in posting updates!! Digging the basement turned out to be a much bigger project than we realized! I couldn't believe all the dirt that came out of that hole!! But we finally got it done, despite several days of yucky weather. Of course, we would have to build our house in the coldest and wettest winter I can remember for quite some time!
Progress at last!!
Well, we have finally made some real progress! The last few weeks have been kind of tedious with not much exciting going on. We had to scrape the basement, remove all the rocks, put gravel down, compact it, scrape the footers out and compact those. . . . .Then we put down plastic, foam insulation and wire to hold the radiant floor tubing in place. And today, after a LOT of prep work, we poured the footers and foundation for the basement!!! Hooray! Here are some photos so you can see the progress. (pics 1 and 2 are backwards!) Now, on to the walls. . . . . . . . .